Scheduled time period

Monday 31st August 2026 at 6:00am to Thursday 24th September 2026 at 6:00am

Reduced Perenco Bacton throughput. Phasing down production between 31/08/2026 - 02/09/2026. Zero production between 05/09/2026 - 13/09/2026. Partial reinstatement expected from 13/09/2026 onwards; full reinstatement by 24/09/2026.

Perenco Bacton Terminal planned maintenance shutdown

Unavailable Capacity
4.2mcm/d
Available Capacity
3.3mcm/d
Technical Capacity
7.5mcm/d
Further Information