Scheduled time period

Saturday 9th May 2026 at 6:00am to Tuesday 12th May 2026 at 5:00pm

Reduction in flow to zero Mm3/d during the event. Rev. 4 : Bacton available, REMIT cancelled

Planned maintenance for Shell Bacton Gas Terminal

Unavailable Capacity
27.3mcm/d
Available Capacity
0mcm/d
Technical Capacity
27.3mcm/d
Further Information