Scheduled time period
Saturday 9th May 2026 at 5:00am to Monday 25th May 2026 at 12:06amFull outage. Injection.
Planned Outage
Unavailable Capacity
293.33GWh/d
Available Capacity
0GWh/d
Technical Capacity
293.33GWh/d