Scheduled time period

Friday 31st July 2026 at 1:00pm to Wednesday 5th August 2026 at 7:00pm

There will be a period of reduced rates either side of the shutdown as production ramps down and restarts

Planned maintenance

Unavailable Capacity
7mcm/d
Available Capacity
0mcm/d
Technical Capacity
7mcm/d
Further Information