Scheduled time period
Friday 7th August 2026 at 10:00am to Saturday 8th August 2026 at 6:00amElgin Franklin flows to restart at Bacton SEAL from 10am, flows will increase over the gas day.
Unavailable Capacity
1.9mcm/d
Available Capacity
2.5mcm/d
Technical Capacity
4.4mcm/d