This is not the latest revision of this event. Please click here to see the latest update.
Further Information
Impacted time period
Sunday 13th September 2026 at 5:21pm to Monday 14th September 2026 at 6:00amReduction in flow to zero MCM/d for the duration of the event
Unplanned Bacton Shell plant trip due to loss of power, resulting in zero throughput
Unavailable Capacity
27.3mcm/d
Available Capacity
0mcm/d
Technical Capacity
27.3mcm/d