Impacted time period
Sunday 13th September 2026 at 5:21pm to Monday 14th September 2026 at 6:00pmReduction in flow to zero MCM/d for the duration of the event Extended end time
Unplanned Bacton Shell plant trip due to loss of power, resulting in zero throughput
Unavailable Capacity
27.3mcm/d
Available Capacity
0mcm/d
Technical Capacity
27.3mcm/d