Scheduled time period
Thursday 10th September 2026 at 9:00am to Tuesday 15th September 2026 at 6:00amElgin Franklin production back to normal levels.
Unavailable Capacity
0mcm/d
Available Capacity
6.1mcm/d
Technical Capacity
6.1mcm/d