Impacted time period

Saturday 26th September 2026 at 6:00am to Saturday 26th September 2026 at 2:00pm

Routing valve stuck in transit (In addition to reduced flow REMIT)

Failure

Unavailable Capacity
27.76GWh/d
Available Capacity
195.54GWh/d
Technical Capacity
293.33GWh/d