Impacted time period
Saturday 26th September 2026 at 6:00am to Saturday 26th September 2026 at 7:10amRouting valve stuck in transit (In addition to reduced flow REMIT)
Failure
Unavailable Capacity
27.76GWh/d
Available Capacity
195.54GWh/d
Technical Capacity
293.33GWh/d