Scheduled time period
Saturday 13th June 2020 at 6:00am to Thursday 23rd July 2020 at 6:00amThere will be a period of reduced rates for a few days either side of the shutdown as production ramps down & restarts
Planned gas production field unavailability at Greater Britannia Area
Unavailable Capacity
7mcm/d
Available Capacity
0mcm/d
Technical Capacity
7mcm/d