This is not the latest revision of this event. Please click here to see the latest update.

Scheduled time period

Monday 31st August 2026 at 6:00am to Thursday 24th September 2026 at 6:00am

Reduced Perenco Bacton throughput. Phasing down production between 31/08/2026 - 02/09/2026. Further reduction in flow from 06:00 04/09/2026. Zero production possible from 18:00 04/09/2026. Partial reinstatement expected from 13/09/2026 onwards; full reinstatement by 24/09/2026. 18:30hrs All forward flow has ceased for the commencement of the annual shutdown. Full reinstatement expected 24/09/2026

Perenco Bacton Terminal planned maintenance shutdown

Unavailable Capacity
7.5mcm/d
Available Capacity
0mcm/d
Technical Capacity
7.5mcm/d
Further Information