Scheduled time period
Monday 16th June 2025 at 6:00am to Tuesday 24th June 2025 at 6:00amReduced Perenco Dimlington throughput. Restart following shutdown delayed. Terminal remains offline
planned maintenance shutdown
Unavailable Capacity
4.7mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.7mcm/d