Scheduled time period

Monday 16th June 2025 at 6:00am to Monday 23rd June 2025 at 5:30pm

Reduced Perenco Dimlington throughput. Restart following shutdown delayed. Terminal remains offline Dimlington Terminal return to export. Current export 30mmscf 0.8mcm....Follow up REMITS will be submitted overnight. Perenco Dimlington Terminal export increased to 4.2mcm

planned maintenance shutdown

Unavailable Capacity
0.7mcm/d
Available Capacity
4.2mcm/d
Technical Capacity
4.9mcm/d