Scheduled time period
Monday 16th June 2025 at 6:00am to Monday 23rd June 2025 at 1:30pmReduced Perenco Dimlington throughput. Restart following shutdown delayed. Terminal remains offline Dimlington Terminal return to export. Current export 30mmscf 0.8mcm....Follow up REMITS will be submitted overnight. Perenco Dimlington Terminal export increased to 4.2mcm Perenco Dimlington Terminal export increasing as more offshore gas made available. Current export rate at 4.4mcm. Terminal online and flowing to capacity. All offshore platforms available
planned maintenance shutdown
Unavailable Capacity
0mcm/d
Available Capacity
4.75mcm/d
Technical Capacity
4.75mcm/d