This is not the latest revision of this event. Please click here to see the latest update.
Further Information
Scheduled time period
Monday 16th June 2025 at 6:00am to Monday 23rd June 2025 at 5:30pmReduced Perenco Dimlington throughput. Restart following shutdown delayed. Terminal remains offline Dimlington Terminal return to export. Current export 30mmscf 0.8mcm....Follow up REMITS will be submitted overnight. Perenco Dimlington Terminal export increased to 4.2mcm Perenco Dimlington Terminal export increasing as more offshore gas made available. Current export rate at 4.4mcm.
planned maintenance shutdown
Unavailable Capacity
0.5mcm/d
Available Capacity
4.4mcm/d
Technical Capacity
4.9mcm/d