Scheduled time period

Monday 31st August 2026 at 6:00am to Thursday 24th September 2026 at 6:00am

Reduced Perenco Bacton throughput, annual maintenance shutdown on going. Partial reinstatement expected from 14/09/2026 onwards; full reinstatement by 24/09/2026.

Perenco Bacton Terminal planned maintenance shutdown

Unavailable Capacity
7.5mcm/d
Available Capacity
0mcm/d
Technical Capacity
7.5mcm/d
Further Information